The Building of Moruya Bicycles, Mk II

Click on the pictures to enlarge them. There are no further details, despite all the "More details" buttons. I just don't know how to get rid of them.

Preparation Begins

16/9/08

The Side Path is Removed

17/9/08

Greg Digging Foundations

The Foundations are Poured

Damien Removing Air

19/9/08

Concrete Truck

Reversing between the safety barrier and the foundation holes was a precise job.

Checking the Job

19/9/08

Greg, and Damien's dog, check the level.

The Footing Outside the Window

19/9/08

The person in orange shirt and short hair is Pip Smith, the shop's main architect and also parner in the buiding company building the shop.

Ready to Pour - Outside

26/9/08

Ready to Pour - Inside

26/9/08

Open, But Not for Business

30/9/08

October Begins

1/10/08

View From the East

1/10/08

Formwork In

3/10/08

The New Slab

3/10/08

The Shop Widens

3/10/08

The Structure Begins

13/10/08

It's Crowded. It's Really, Really, Really Crowded.

16/10/08

Stairs Nearly In

16/10/08

The Inside Takes Shape

8/11/08

The Old Front Door is Moved to the Back

8/11/08

The Base Brickwork on the South Wall Progresses

8/11/08

Looking across to the Mower Centre.

Ready to Install the Shower

8/11/08

Looking Up the Stairs

8/11/08

The View From Upstairs

8/11/08

Insulation & Wires

8/11/08

Upstairs, before the Gyprock.

Looking Through the Office from the Storeroom

8/11/08

The View from the Office

8/11/08

Window Frames In Waiting

12/11/08

Orange for the main front window, blue for the rest.

Don't Worry, The Power's Off!

12/11/08

Gyprocking

12/11/08

Greg and Damien in the office.

Shop almost done east wall

30/11/08

Thanks to Randolph who was visiting for taking this and the next few photos.

Shop almost done front

30/11/08

Shop almost done south wall

30/11/08

Shop almost done south west corner

30/11/08

The Opening Party

Thanks to Anita for these photos. We'd moved in in that the computer and phones were installed, plus some bikes. And about 2 parts.